MHS Open House 2018

These photos were taken at the Open House held at MHS to show off the remodeled school with the new gym and football field. Of particular note:

  • No. 15 School was torn down and the high school building was extended all the way to Averill. This new extension contains the new gym with a large lobby area, weight room, and 4 locker rooms (2 for boys ... home and away teams ||| 2 for girls ... home and away team)
  • The old girls' gym is still there.
  • The old boys' gym is now the cafeteria.
  • There is no swimming pool. It is scheduled to be added in a separate addition, on the corner of Pearl and Averill.
  • The cafeteria was torn down, as were houses along Averill Ave., to make room for a football field with a large scoreboard. One of the photos ("North side - no cafeteria - no archway") shows the building from where the cafeteria used to be and showing the doorway that used to be the archway to the cafeteria.
  • The auditorium is being totally redocorated, but the murals are still there, and it is mostly unchanged.

New pictures will be added at some point.


Thumbs Per Page
  
Jump To Page
Next Page













 
Thumbs Per Page
  
Jump To Page
Next Page